Reinforced Concrete Works & Surrounding Area
Complete works beyond the prefabricated shell reinforced concrete works and the supplementary constructions of the plot are an important part of a complete residential project.
Beyond the construction of the prefabricated shell, many projects require additional works related to the plot, the foundation, retaining walls, tanks, swimming pools, and permanent reinforced concrete structures.
Reinforced concrete works
Indicatively, we undertake:
- foundations and slabs
- retaining walls
- basements and tanks
- staircases
- bases and technical structures
The works are carried out based on approved studies and under technical supervision, ensuring durability, accuracy, and compatibility with the home that will follow.
Surrounding area & supplementary constructions
At the same time, we can undertake the landscaping and development of the surrounding area, such as:
- swimming pools
- shelters and pergolas
- garages
- fencing
- ground formations and access routes
The design and implementation are coordinated with the residence, so that the entire project has a unified aesthetic and technical logic.
Mandatory project supervision by EasyGreen
When the above works are undertaken by EasyGreen, technical supervision of the project is mandatory.
Supervision ensures:
- proper implementation of the studies
- quality and timeline control
- coordination of work crews
- reduction of technical and financial risks
Especially in projects outside the company’s base, such as islands or remote areas, organised supervision is essential for the smooth progress of the project.
Supervision cost & transparency
Supervision is priced separately, usually as a percentage of the budget for the reinforced concrete works and the surrounding area.
The percentage is determined according to:
- the size and complexity of the project
- the geographical location
- the duration and requirements for on-site presence
The client knows from the beginning what we undertake, how we supervise, and at what cost.